MBSE Implementation Challenges
- Requirements continually evolving during design process
- Managing MBSE model versions and revisions (change)
- Linking Simulation models to MBSE models for V&V
- Linking Test results to MBSE models for V&V
- Linking discipline-specific Design models to MBSE models for V&V
- Managing model lifecycles, approval and change processes, access
Benefits of MBSE Integration
Persistent administration in an extended PLM and/or ALM System for MBSE artifacts
- Integration of MBSE into the enterprise ECM (Engineering Change Management) and CM (Configuration Management) processes
- Managed access control
- Visualization of the MBSE artifacts
- Data exchange in the early phase based on standard